- To obtain Indefeasible Right of Use (IRU) of 40 optical channels on a direct submarine cable between Europe and Brazil.
- To deploy two upgradeable 100Gbps links for:
- GÉANT-RedCLARA interconnection;
- Copernicus traffic.
- To complete RedCLARA dark fibre network and deploy a 100Gbps upgradeable network from Brazil to Colombia.